From the street to the meeting room
Work in the MP’s office moved between local concerns, agency discussions and legislative research. Listening established the questions; preparing information and bringing the relevant people into discussion helped take them further.
In March 2025, I joined MP Paramait and the District 1 team in listening to vendors on Maha Chak Road. Their concerns about trading space became part of subsequent discussion with Bangkok’s municipal-enforcement officials.

Bringing vendor concerns into municipal discussion
Listening to vendors raised a practical question: how could pedestrian safety, livelihoods and continuity for local communities be considered together?
I brought those concerns into discussion with municipal-enforcement officials, as part of the parliamentary team’s coordination work.


Working across responsibilities
Municipal enforcement was one part of a wider coordination role. Transport, community issues and local services each involved different agencies, making the preparation of briefings and direct discussion an important part of the office’s work.
The archive below brings together separate meetings with agencies and community representatives. It includes traffic issues and residents’ complaints, as well as accompanying MP Paramait to the Mass Rapid Transit Authority of Thailand.




Tuk-tuk policy across agencies
Tuk-tuk policy makes this overlap of responsibilities particularly clear. The issues bring together responsibilities spread across traffic police, the Department of Land Transport and the Bangkok Metropolitan Administration. Moving a proposal forward means bringing these agencies into the same conversation.
My work focused on making those connections clearer: what information needs to be shared, which questions need a joint response, and how the proposal can be taken forward across organisational boundaries.

The proposal connects vehicle registration, detection and a command system. It remains a proposal for discussion, with no claim of agency approval or an installed system.

Following a concern beyond the meeting
Coordination also meant returning to an issue after the initial discussion. At Khlong Satri Chulanak, residents raised concerns about wastewater, stagnant water and insects.
MP Paramait referred the issue to Bangkok Metropolitan Council’s cleanliness and environment committee. I joined the District 1 team’s meeting and contributed possible approaches, considering accumulated sediment and connections to the surrounding drainage network.
On site · Khlong Satri Chulanak


Khlong Satri Chulanak: a continuing follow-up
The MP’s April follow-up described dredging by the district office and agencies, while the district documented a joint site visit with the MP on 4 April 2025. My work concerned coordination and follow-up; the agencies were responsible for operations.
The MP’s account described dredging as short-term relief. Canal design and drainage remained longer-term issues, so the follow-up distinguished immediate action from the work still needed.

A separate field assignment
A preliminary earthquake survey
Fieldwork also included documenting urgent concerns. On assignment from MP Paramait, I joined a preliminary survey of 12 temples and shrines after the earthquake, looking for visible damage and issues needing follow-up.
The account was published on 13 April 2025 and describes the survey in the previous week. This was an initial visual survey, not an engineering safety certification.
From practical questions to proposed rules
Alongside constituency coordination, my role included legislative research and joint drafting. This work considered a different scale of responsibility: the rules governing platforms, businesses and consumers.
I researched and co-drafted proposals on platform accountability, consumer protection and cross-border tax compliance with the MP’s team. The public record describes joint preparation with Paramait Vithayaruksun and Unchisa Rojanayooktanon.
Proposed Electronic Commerce Bill · 2025
Accountability with proportionate protection
Platform businesses connect questions of accountability, consumer protection and cross-border trade. The proposal sought legal tools for overseeing these business models while treating the different parties fairly.
The design work went beyond adding platform obligations. It considered how to address unlawful listings while allowing sellers to respond, and how duties should account for smaller businesses.
Proposal statusA legislative proposal prepared jointly in 2025. This was shared research and drafting, without attributing individual clauses or the whole legislative design to me.

Sharing how parliamentary work happens
Public problems deserve a voice in Parliament.
I also took part in civic learning outside the office. I was invited to speak about working in Parliament and the role of a parliamentary team in bringing people’s concerns into the legislative process.
The session connected that work to civic participation: identifying a public problem, developing it into a motion and explaining why it matters.

